City of Galth Golden heights Water Treatment Plant Expansion Phase 3 Project SCH#2011012024

2 Documents in Project

Summary

SCH Number
2011012024
Lead Agency
City of Galt
Document Title
City of Galth Golden heights Water Treatment Plant Expansion Phase 3 Project SCH#2011012024
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2011
Present Land Use
Existing Water Treatment Plant/Public-Quasi-Public Zoning district/Public-Quasi-Public land use designation.
Document Description
The purpose of the proposed Project is to increase the overall capacity of the existing WTP and add facilities necessary to reduce treated water arsenic levels, along with iron and manganese, at the plant thereby improving water quality to meet current standards. Improvements will include installation of a new 1,700 +/- foot deep well, new water, sewer and storm drain piping, a new chemical storage/garage/electrical and controls structure, a new carbon dioxide storage tank and feed system, two new filter vessels, three new booster pumps, a new 100,000 gallon backwash reclaim tank to replace an existing tank, new generator, relocation of a fire hydrant, and related facilities.

Contact Information

Name
Sandra Kiriu
Agency Name
City of Galt Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Galt
Counties
Sacramento
Cross Streets
901 Golden Heights Drive
Zip
95623
Total Acres
1.23
Parcel #
148-0630-063
State Highways
Hwy 99
Railways
no
Airports
no
Schools
Lake Canyon ES
Waterways
Cosumnes River
Township
5N
Range
6E
Section
14
Base
MDB&M

Notice of Determination

Approving Agency
City of Galt
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print