Mountain Gate Services District Water Treatment Plant Improvement Project

2 Documents in Project

Summary

SCH Number
2011012021
Lead Agency
Mountain Gate Community Services District
Document Title
Mountain Gate Services District Water Treatment Plant Improvement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed Project results entails: the construction of a 0.5 MG water tank that is 60 ft in diameter and 27 ft high; recoating the interior and exterior of an existing 0.25 MG water tank to be converted to a recycle water tank to provide water to the Lehigh Cement cooling pond; expansion of the existing 624 sq ft control building by 555 sq ft; installation of an additional 8 ft diameter by 30 ft long horizontal filter; replacement of the existing emergency standby generator; removal of an existing 300 foot long 8 inch vinyl pipeline lying on the surface and replacement with 6 inch diameter PVP piping at a minimum depth of 36 inches; and, lining the existing backwash pond for sludge drying with a high density polyethylene liner.

Contact Information
Bridget Binning
CA Department of Public Health
1616 Capitol Avenue, MS 7408 P.O. Box 997377
Sacramento, CA 95899-7377

916 449 5600

Location

Coordinates
40°44'32.7"N 122°18'56.6"W
Counties
Shasta
Cross Streets
Wonderland Blvd ~ 1 mile north of the Fawndale and I-5 interchange
Zip
96003
Total Acres
~0.70
Parcel #
307-020-003
State Highways
I-5
Railways
UPRR
Schools
Bass ES
Waterways
Shasta Lake
Township
33N
Range
4W
Section
3
Base
MDB&M
Other Location Info
City/Nearest Community: Mountain Gate

Notice of Determination

Approving Agency
Department of Public Health
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
CA Department of Public Health 1616 Capitol Avenue, MS 7408, P.O. Box 997377

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search