Colombini Water Diversion (MS-14) in Mosher Creek
4 Documents in Project
Summary
SCH Number
2011012010
Lead Agency
Stockton East Water District
Document Title
Colombini Water Diversion (MS-14) in Mosher Creek
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2011
Present Land Use
Present Land Use: Agricultural/Zoning: AG-40/ General Plan Designation: A/G
Document Description
Construction of a new surface water diversion in Mosher Creek for the purpose of irrigating agricultural lands adjacent to the creek. Construction will occur during a non-flow period for the creek and consist of disturbing about 65-cubic yards of river bed and bank necessary to install a sump and pipeline for the water diversion. Once construction in the channel is complete and the disturbed areas restored, a pump capable of conveying 3,000 gallons per minute (gpm) of surface water will be installed on the sump. Similar diversions exists up and downstream of this location. The cost of piping water from these existing diversions (as an alternative) was deemed uneconomical due to the distance between such diversions.
Contact Information
Name
Andres Lozano
Agency Name
Stockton East Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Lodi
Counties
San Joaquin
Cross Streets
Live Oak Rd.
Zip
95240
Total Acres
0.018
Parcel #
063-210-07
State Highways
Hwy 88
Railways
No
Airports
No
Schools
No
Waterways
Mosher Creek
Township
3N
Range
7E
Section
25
Notice of Determination
Approving Agency
Stockton East Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes