Well No. 58

3 Documents in Project

Summary

SCH Number
2011011033
Lead Agency
Anaheim, City of (City of Anaheim)
Document Title
Well No. 58
Document Type
NOD - Notice of Determination
Received

Document Description
Replacement of 2 inactive, shallow wells with a new high water production well that will have a pumping capacity of 2,500-3,500 gallons per minute, and a depth of 1,100 feet. Well 58, located approximately 250 feet west of the two inactive wells, will be built within a 1,820 square foot asphalt paved area currently used for storage. It will work in conjunction with 4 existing active wells that are used to supply the City's Linda Vista Reservoir located on the adjacent easterly property. Well 58 will be screened within an open-air 6-foot high block wall. The project will also require the installation of ancillary piping and the demolition of the two inactive wells, Well 27 and Well 28 which were built in 1960, had a horsepower of 75 hp each, and a maximum depth of 286.6 feet and 363.5 feet, respectively. They will be destroyed per State & local requirements.

Contact Information
Marie Newland
City of Anaheim
201 S. Anaheim Boulevard, Suite 601
Anaheim, CA 92805

(714) 765-4166

Location

Coordinates
33°51'45.4"N 117°50'44.9"W
Cities
Anaheim
Counties
Orange
Cross Streets
Miraloma Avenue and Tustin Avenue
Zip
92806
Total Acres
.04
Parcel #
34514203
State Highways
SR-91 & SR-55
Railways
BNSF
Schools
Glenview ES
Waterways
Santa Ana River
Township
4S
Range
9W
Section
5

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Orange County Clerk-Recorder, EIR Desk 12 Civic Center Plaza, Room 106, Santa Ana, Ca 92701

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search