Well No. 58

3 Documents in Project

Summary

SCH Number
2011011033
Lead Agency
City of Anaheim
Document Title
Well No. 58
Document Type
NOD - Notice of Determination
Received
Posted
4/8/2013
Present Land Use
Zone: Northeast Specific Plan 94-1; underlying zone is Industrial; General Plan designates site for Water Uses
Document Description
Replacement of 2 inactive, shallow wells with a new high water production well that will have a pumping capacity of 2,500-3,500 gallons per minute, and a depth of 1,100 feet. Well 58, located approximately 250 feet west of the two inactive wells, will be built within a 1,820 square foot asphalt paved area currently used for storage. It will work in conjunction with 4 existing active wells that are used to supply the City's Linda Vista Reservoir located on the adjacent easterly property. Well 58 will be screened within an open-air 6-foot high block wall. The project will also require the installation of ancillary piping and the demolition of the two inactive wells, Well 27 and Well 28 which were built in 1960, had a horsepower of 75 hp each, and a maximum depth of 286.6 feet and 363.5 feet, respectively. They will be destroyed per State & local requirements.

Contact Information

Name
Marie Newland
Agency Name
City of Anaheim
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Miraloma Avenue and Tustin Avenue
Zip
92806
Total Acres
.04
Parcel #
34514203
State Highways
SR-91 & SR-55
Railways
BNSF
Schools
Glenview ES
Waterways
Santa Ana River
Township
4S
Range
9W
Section
5

Notice of Determination

Approving Agency
City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print