RE Rosamond One and RE Rosamond Two; Amendment No. 1 to Streambed Alteration Agreement No. 1600-2011-0178-R4

10 Documents in Project

Summary

SCH Number
2011011005
Lead Agency
Kern County
Document Title
RE Rosamond One and RE Rosamond Two; Amendment No. 1 to Streambed Alteration Agreement No. 1600-2011-0178-R4
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2014
Present Land Use
Vacant, Agriculture/A (Exclusive Agriculture), A FP (Exclusive AGriculture) Flood Plain Combining),
Document Description
The CDFW is issuing Amendment No. 1 to Streambed Alteration Agreement 1600-2011-0178-R4 to the Permittees, RE Rosamond One LLC and RE Rosamond Two LLC. The Project as originally permitted includes activities related to the construction and operation of a photovoltaic solar generation facility. Project components in jurisdictional areas include the removal of a 24-inch culvert at the northern boundary of the Project site, photovoltaic panel poles, and the construction of a maximum of nine (9), 15-foot-wide, at-grade service paths that cross Drainage 2. Electrical cable and wire trenches will be located within the service path footprint when they cross Drainage 2 and vegetarian removal and recontouring will occur over the entire length of Drainage 2 within the Project site. A total of 780 cubic yards of fill will be placed at multiple locations in Drainage 2 and a chain link security fence will cross Drainage 2 at the northern and southern Project site boundaries. Amendment No. 1 includes the extension of the deadline date from May 19, 2014 to May 19, 2015 to complete offsite mitigation.

Contact Information

Name
Craig Bailey
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
(1,2) Favorito Ave and Gillman Ave; (3) Highline Road and Bailey Road; Baumbach Ave and Pellisie
Zip
93301
Total Acres
1709
Parcel #
(1,2) 252-013-01; (3) 448-052-35-42; (4) 448-051-30, 31 448-051-69-74
State Highways
Hwy 14

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print