City of Montague Treatment Improvement Project

3 Documents in Project

Summary

SCH Number
2010122085
Lead Agency
City of Montague
Document Title
City of Montague Treatment Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/15/2013
Present Land Use
Low Denisty Residential and R-1, Residential Single Family
Document Description
The California Department of Public Health (Department) is a responsible agency for this project. The Department's Safe Drinking Water Proposition 50 Program is providing state funds for the project. The water system proposes to upgrade the City's existing municipal water treatment system. The replacement system will not expand the existing total treatment capacity. The structural modifications for the proposed project will include the following: 1) Installation of a metal building and two pressure vessels where the largest sludge pond currently exists at the northwest side of the facility; 2) Installation of a concrete pad for filer roll-off containers, 3) Installation of impeller mixers in the existing flocculation basin; 4) Installation of two pipes from reservoirs 1 and 2 to new flash mixer and 5) Addition of ~ 1,200 ft. of small diameter sewer line within the plant's access road right-of-way.

Contact Information

Name
Bridget Binning
Agency Name
CA Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Yreka
Counties
Siskiyou
Cross Streets
Water Treatment Plant - N. East Street
Zip
96025
Total Acres
2,500 linear ft
Parcel #
various
State Highways
I-5
Railways
UPRR
Airports
Montague
Waterways
Klamath River
Township
45N
Range
6W
Section
22,23
Base
USGS

Notice of Determination

Approving Agency
CA Department of Public Health
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print