Pajaro River Riparian Habitat Restoration Project (Lake or Streambed Alteration Agreement No. EPIMS-SCL-29372-R3)

14 Documents in Project

Summary

SCH Number
2010122059
Lead Agency
Santa Clara Valley Habitat Agency (SCVHA)
Document Title
Pajaro River Riparian Habitat Restoration Project (Lake or Streambed Alteration Agreement No. EPIMS-SCL-29372-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/7/2023
Document Description
The Project is limited to restoration through grading and planting of vegetation along Pajaro River. The Project includes approximately 1.17 acres of grading conducted along approximately 1,000 linear feet of river to create a floodplain area and to widen the channel by approximately 85 feet. There will be approximately 5,650 cubic yards of soil removed to create the floodplain. Soil removed due to grading will be spread across 4.25 acres, including a 50- foot-wide area along the top of bank that will be planted with riparian vegetation.

Contact Information

Name
Kristin Garrison
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
unincorporated area
Counties
Santa Clara
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is located along a 3,800-foot-long reach of the Pajaro River upstream of the confluence with Llagas Creek. The coordinates are 36.972141° N latitude and -121.501875° W longitude (NAD 83 or WGS 84). The Assessor’s Parcel Number is 841-39-024.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print