Trout Creek Restoration Project

4 Documents in Project

Summary

SCH Number
2010122026
Lead Agency
Truckee, City of (City of Truckee)
Document Title
Trout Creek Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2011
Present Land Use
Creek/Public, Downtown High Density Residential, 24 du/ac., Downtown Mixed-Use, Master Plan/Downtown Specific Plan Area

Document Description
Restoration of a portion of Trout Creek, defined as Reaches 1 through 3, to provide a more stable and natural creek corridor with improved biological function and floodplain quality. Includes some utility relocation, replacement of two bridge structures, removal of a concrete flume, disturbance of waters of the United State and mapped floodplain, creation of 0.12 acres of wetlands, and restoration of the creel to a more naturally functioning creek.

Contact Information
Danyelle Nishimori
City of Truckee
10183 Truckee Airport Road
Truckee, CA 96161

Phone : (530) 582-2934

Location

Coordinates
37°25'19.1"N 122°05'06"W
Cities
Truckee
Counties
Nevada
Cross Streets
Donner Pass Rd./Trout Creek Rd; Bridge St.Jibboom St.
Zip
96161
Total Acres
~ 2
Parcel #
Multiple
State Highways
Hwy 80, 89
Railways
UPRR
Airports
Truckee Tahoe
Schools
Truckee HS
Waterways
Truckee River, Trout Creek
Township
17N
Range
16E
Section
10,11
Base
MDB&M

Notice of Determination

Approving Agency
Town of Truckee Town Council
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
10183 Truckee Airport Road Truckee, CA 96161

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print