Trout Creek Restoration Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010122026
- Lead Agency
- Truckee, City of (City of Truckee)
- Document Title
- Trout Creek Restoration Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/2/2011
- Present Land Use
- Creek/Public, Downtown High Density Residential, 24 du/ac., Downtown Mixed-Use, Master Plan/Downtown Specific Plan Area
- Document Description
- Restoration of a portion of Trout Creek, defined as Reaches 1 through 3, to provide a more stable and natural creek corridor with improved biological function and floodplain quality. Includes some utility relocation, replacement of two bridge structures, removal of a concrete flume, disturbance of waters of the United State and mapped floodplain, creation of 0.12 acres of wetlands, and restoration of the creel to a more naturally functioning creek.
- Contact Information
-
Danyelle Nishimori
City of Truckee
10183 Truckee Airport Road
Truckee, CA 96161
Phone : (530) 582-2934
Location
- Coordinates
- 37°25'19.1"N 122°05'06"W
- Cities
- Truckee
- Counties
- Nevada
- Cross Streets
- Donner Pass Rd./Trout Creek Rd; Bridge St.Jibboom St.
- Zip
- 96161
- Total Acres
- ~ 2
- Parcel #
- Multiple
- State Highways
- Hwy 80, 89
- Railways
- UPRR
- Airports
- Truckee Tahoe
- Schools
- Truckee HS
- Waterways
- Truckee River, Trout Creek
- Township
- 17N
- Range
- 16E
- Section
- 10,11
- Base
- MDB&M
Notice of Determination
- Approving Agency
- Town of Truckee Town Council
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 10183 Truckee Airport Road Truckee, CA 96161
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.