Peaceful Glen Road Improvement Project - Phase 4
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010122025
- Lead Agency
- Solano County
- Document Title
- Peaceful Glen Road Improvement Project - Phase 4
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/21/2011
- Document Description
- The project is located along Peaceful Glen Road, 5.4 miles north of the City of Vacaville, Solano County. The project includes the repair of the retaining wall structure located on the south side of Peaceful Glen Road, bank stabilization on both the north and south sides of Sweeney Creek, and widening a segment of the paved road. The bank will be re-graded and re-established to its approximate original location with a block wall retaining structure. The slopes will be laid back to approximately 1.5:1. The CDFG is executing a Lake and Streambed Alteration Agreement No. 1600-2011-0039-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Philip Seilhan/Solano County Resource Management.
- Contact Information
-
Brenda Blinn
DFG Bay Delta Region
Lead/Public Agency
7329 Silverado Trail
Napa, CA 94558
Phone : (707) 944-5541
Location
- Cities
- Vacaville
- Counties
- Solano
- Cross Streets
- Timm Road
- Zip
- 95688
- Parcel #
- County Road
- State Highways
- HWY 505
- Railways
- no
- Airports
- no
- Schools
- no
- Waterways
- Sweeney Creek
- Township
- 7N
- Range
- 1W
- Section
- 17
- Base
- MDB&M
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.