Large Generator Interconnection Agreement - McHenry Solar Farm Project

7 Documents in Project

Summary

SCH Number
2010122021
Lead Agency
Modesto Irrigation District
Document Title
Large Generator Interconnection Agreement - McHenry Solar Farm Project
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2011
Present Land Use
PLU: Agriculture Z: Agriculture with a 40-acre minimum parcel size (A-2-40) GPD: Agriculture
Document Description
Modesto Irrigation District (MID) proposes to enter into a Large Generator Interconnection Agreement (LGIA) with Solar Star California VII, LLC (a wholly-owned subsidiary of the SunPower Corporation). As part of the Project, MID is proposing to construct, own, and operate a switching station in a new switchyard to be located on the project site, as well as a new overhead 69-kilovolt (kV) sub-transmission line and 12-kV distribution line that would interconnect the proposed solar facility to the existing MID electric system. The project would operate year-round, generating electricity during daylight hours.

Contact Information

Name
David Olivares
Agency Name
Modesto Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Modesto, Riverbank
Counties
Stanislaus
Cross Streets
Patterson Road, McHenry Avenue
Zip
95367
Total Acres
154
Parcel #
074-002-021, -029, -030, & -031
State Highways
Hwy 108
Railways
No
Airports
No
Schools
Rio Altura ES
Waterways
Stanislaus River, MID Main Canal
Township
2S
Range
9E
Section
28
Other Location Info
City/Nearest Community: Del Rio

Notice of Determination

Approving Agency
Modesto Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.