300 Airport Boulevard

7 Documents in Project

Summary

SCH Number
2010122012
Lead Agency
City of Burlingame
Document Title
300 Airport Boulevard
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2014
Present Land Use
Anza Point North (APN) zoning, Anza Point South (APS) zoning, Anza Point - Waterfront Commercial LUD.
Document Description
The BCDC permit application requested authorization for the construction of a portion of a realigned road (Airport Blvd.), a shoreline revetment, stormwater outfalls, outdoor patios, and a total of 3.7 acres of public access area at the project site's eastern and western shorelines. These activities are associated with the development of a six-building office campus and the realignment of a majority of Airport Boulevard, which are located outside of BCDC's jurisdiction. The BCDC permit conditionally authorizes activities located in its jurisdiction, and remains valid as long as the activities authorized remain in place.

Contact Information

Name
Jaime Michaels
Agency Name
SF Bay Cons & Dev Comm (BCDC)
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Cross Streets
Beach Road/Airport Boulevard
Zip
94010
Parcel #
026-350-130, etc.
State Highways
US 101, SR 82
Airports
SFO
Schools
BHS, SMHS, Washington, ...
Waterways
SF Bay, Sanchez Channel, Anza Lagoon
Township
4S
Range
4W
Section
17/18
Base
MDB&M

Notice of Determination

Approving Agency
SF BCDC
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print