300 Airport Boulevard

7 Documents in Project

Summary

SCH Number
2010122012
Lead Agency
Burlingame, City of (City of Burlingame)
Document Title
300 Airport Boulevard
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2014
Present Land Use
Anza Point North (APN) zoning, Anza Point South (APS) zoning, Anza Point - Waterfront Commercial LUD.

Document Description
The BCDC permit application requested authorization for the construction of a portion of a realigned road (Airport Blvd.), a shoreline revetment, stormwater outfalls, outdoor patios, and a total of 3.7 acres of public access area at the project site's eastern and western shorelines. These activities are associated with the development of a six-building office campus and the realignment of a majority of Airport Boulevard, which are located outside of BCDC's jurisdiction. The BCDC permit conditionally authorizes activities located in its jurisdiction, and remains valid as long as the activities authorized remain in place.

Contact Information
Jaime Michaels
SF Bay Cons & Dev Comm (BCDC)
455 Golden Gate Ave., Suite 10600
San Francisco, CA 94102

Phone : (415) 352-3600

Location

Coordinates
37°35'22"N 122°19'55"W
Cities
Burlingame
Counties
San Mateo
Cross Streets
Beach Road/Airport Boulevard
Zip
94010
Parcel #
026-350-130, etc.
State Highways
US 101, SR 82
Airports
SFO
Schools
BHS, SMHS, Washington, ...
Waterways
SF Bay, Sanchez Channel, Anza Lagoon
Township
4S
Range
4W
Section
17/18
Base
MDB&M

Notice of Determination

Approving Agency
SF BCDC
Approved On
Final EIR Available Location
SF BCDC, 455 Golden Gate Ave., Suite 10600, San Francisco, CA 94102

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search