Maintenance Cleaning of Sediment from 46 Culverts and Drainages in West Marin County, CA

4 Documents in Project

Summary

SCH Number
2010122004
Lead Agency
Marin County
Document Title
Maintenance Cleaning of Sediment from 46 Culverts and Drainages in West Marin County, CA
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2011
Present Land Use
Coastal Open Space, Coastal Single Family, Coastal General Commercial and Mixed Use, Coastal Agricultural/Coastal Corridor
Document Description
The MWCPWD proposes to excavate approximately 8,183 linear feet (0.79 acre) of wetlands and waters of the U.S. and State, resulting in removal of approximately 2,597 cubic yards of sediment. Operating from the road or top of bank, an excavator would remove accumulated sediment from these channels and drainage ditches. A small dozer would be placed in the Second Valley, First Valley and Lewis Gulch creek channels to facilitate sediment removal. Temporary cofferdams would be used at 7 creek channels to isolate the work area and protect water quality and aquatic resources. Excavation of sediment will result in the temporary loss of freshwater and saltwater marsh vegetation and removal of about 84 riparian trees (willows and alders approximately 2-12 inches in diameter). These habitats support the following listed threatened and endangered species that potentially occur in the project area: CA black rail, CA clapper rail, CA red-legged frog, coho salmon and steelhead trout. MCDPW will emphasize avoidance of impacts to biological resources and water quality through the use of specific and general measures and provide in-kind replacement of removed riparian trees over 6 inches in trunk diameter.

Contact Information

Name
Ruth Pratt
Agency Name
Marin County
Contact Types
Lead/Public Agency

Location

Counties
Marin
Cross Streets
Sir Francis Drake Blvd., Bear Valley Rd., Fairfax-Bolinas Rd., and Olema-Bolinas Rd.
Zip
94937
Total Acres
.79
Parcel #
119-040-07 et al.
State Highways
Hwy 1
Schools
Bolinas-Stinson School
Waterways
Numerous
Other Location Info
City/Nearest Community: Inverness and Bolinas

Notice of Determination

Approving Agency
Marin County Department of Public Works Director
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print