Former Baltimore Aircoil Company Facility Soil Remediation

2 Documents in Project

Summary

SCH Number
2010121076
Lead Agency
Regional Water Quality Control Board, Region 5 (Central Valley), Sacramento
Document Title
Former Baltimore Aircoil Company Facility Soil Remediation
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2011
Present Land Use
Light Manufacturing/Industrial
Document Description
In situ treatment for chromium-impacted soil in a former wood treatment area (~ 0.6 acres) by injecting a dilute mix of alcohol and corn syrup. The project involves installing 32 injection wells that target ~ 30,000 cubic yards of soil. The injection solution will consist of potable water with ~ 2 grams per liter (g/L) of total organic carbon from corn syrup (75 percent by weight) and methyl alcohol (25 percent by weight). Ferrous sulfate may be added up to a concentration of 1 g/L of ferrous iron. The treatment solution will injected over a period of up to 6 months. The total volume of treatment solution will be 13.8 acre - feet, equal to 1.5 times the soil pore space volume. After completing the cleanup, the injection wells will be properly abandoned and the ground surface restored.

Contact Information

Name
Nathan Casebeer
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency

Location

Cities
Merced
Counties
Merced
Cross Streets
Beachwood Drive & Santa Fe Drive
Zip
95348
Total Acres
40
Parcel #
057-500-034
State Highways
Hwy 99
Railways
No
Airports
No
Schools
Joe Stefani, Franklin
Waterways
Merced Irrigation District Canal and Black Rascal Creek
Township
7S
Range
13E
Section
10
Base
HS4521

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print