Addendum to the California Department of Public Health "Plant F41A Replacement Project"

4 Documents in Project

Summary

SCH Number
2010121070
Lead Agency
California Department of Public Health (CDPH)
Document Title
Addendum to the California Department of Public Health "Plant F41A Replacement Project"
Document Type
NOD - Notice of Determination
Received
Posted
11/26/2013
Document Description
The CA Dept. of Public Health as the lead agency will be issuing a water supply permit. The Fontana Water Company (FWC) proposes to install a new well, Well F-54, to replace Well F41A. The project will also involve installation of about 3,000 feet of associated underground pipeline to connect Well F54A to the existing graded dirt road alignments and disturbed mining areas, avoiding disturbance of the Lytle Creek floodplain and reducing the overall length of the new pipeline from Well F54A to the FWC water distribution system. This is the second addendum prepared for this project and combined with the original initial study and final mitigated negative declaration package and first addendum, this document serves as the basis for this third tier environmental review of FWC's decision to replace inoperable Well F41A and connect it to the FWC distribution system. This addendum modifies the MND, adopted by the Department on December 22, 2010 and addendum No. 1 approved on February 1, 2012, as the CEQA environmental determination for the proposed implementation of the Well F54A project.

Contact Information

Name
Larry Morgan
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Fontana
Counties
San Bernardino
Cross Streets
Riverside Avenue/Insitution Road
Zip
92337
State Highways
Hwy 10
Waterways
Lytle Creek

Notice of Determination

Approving Agency
CA Dept. of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print