Plant F41A Replacement Project

4 Documents in Project

Summary

SCH Number
2010121070
Lead Agency
California Department of Public Health (CDPH)
Document Title
Plant F41A Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2011
Document Description
The FWC water supply system includes 34 operating groundwater wells which supply water to the FWC system. One of the existing FWC wells, Well F41A, was constructed in 1925and has been producing water from the Lytle Creek Groundwater Basin (Lytle Creek Basin) for more than 85 years. While attempting to refurbish existing WellF41A, FWC determined the existing well casing had collapsed. The age of the well and the weakness of the casing, combined with the loss of water flow from the well after relining, make it impractical to refurbish the existing well and more economical and water production efficient to abandon the existing well and construct a new replacement well. Existing Well F4iA is no longer serviceable and has been taken out of production by FWC. FWC has selected a site that meets the identified criteria for location of the replacement well. FWC has designated the replacement site as Plant F54A and designated replacement well as Well F54A. In addition to constructing and operating the replacement well, this project will include the installation of an underground water pipeline to connect the new Plan F54A Well to FWC's existing water distribution system. The existing Plant F41A Well will be abandoned and filled in accordance with CDPH standards for the destruction of water production wells.

Contact Information

Name
Kelvin Yamada
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Fontana
Counties
San Bernardino
Cross Streets
Riverside Avenue/Insitution Road
Zip
92337
State Highways
Hwy 10
Waterways
Lytle Creek

Notice of Determination

Approving Agency
CA Dept. of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print