Ocotillo Express Wind Energy Project EIS/EIR

4 Documents in Project

Summary

SCH Number
2010121055
Lead Agency
Imperial County
Document Title
Ocotillo Express Wind Energy Project EIS/EIR
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2012
Present Land Use
Open Space with small areas within the Floodway and Desert Residential designations
Document Description
CDFG is executing a Lake or Streambed Alteration Agreement (SAA # 1600-2011-0192-R6 [Revision2]) pursuant to Section 1602 of the Fish and Game Code to the project Applicant: Ocotillo Express LLC, represented by Ms. Dyann Blaine, Pier 1, Bay 3, City of San Francisco, State of California, 94111, Phone (415) 283-4300. The OWEF Project will consist of construction, operation, and maintenance of up to a 315 megawatt wind energy facility. A network of 20-foot-wide permanent roads will be built through the Facility to provide access to each of the 112 wind turbine generators. Low water crossings will be constructed for access roads crossing larger and deeper drainage courses. All wind turbines will be placed outside of drainages larger than 8 ft. across and crossing will be designed at right angles.

Contact Information

Name
Magdalena Rodriguez
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Cross Streets
Imperial Highway (S2)/I-8
Zip
92259
Total Acres
12,436
State Highways
S2
Railways
San Diego Imperial Valley RR
Other Location Info
City/Nearest Community: Ocotillo

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print