East Los Angeles College - South Gate Educational Project - Removal Action Workplan

12 Documents in Project

Summary

SCH Number
2010121044
Lead Agency
Los Angeles Community College District
Document Title
East Los Angeles College - South Gate Educational Project - Removal Action Workplan
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2017
Present Land Use
Z: Heavy Manufacturing GP: Mixed Commercial/industrial, Subarea 1 South Gate College District
Document Description
Project is the approval by the DTSC of a Removal Action Workplan (RAW) East Los Angeles College - South Gate Educational Project (Site), dated March 2017, pursuant to Chapter 6.5, Division 20, Section 25355(a)(1) of the Health and Safety Code. The 18.5 acre Site is located at 2525 Firestone Blvd., at the northwest corner of the Firestone Blvd/Santa Fe Ave. intersection, in the City environmental cleanup of the Site based on an amended Voluntary Cleanup Agreement (VCA) [Docket No. HSA-VCA12/13-055] executed between the DTSC and LACCD dated Jan 03, 2017. The RAW for the Site serves to remove total petroleum hydrocarbon (TPH)-impacted soil in three areas (Area B19, B22 and B39) beneath Building 1. The three areas were identified during previous environmental investigations at the Site. The contamination consists of TPH in the diesel and motor oil hydrocarbon chain ranges. The proposed scope of work proposes cutting out sections of the floor slab, excavating contaminated soil, and disposing of the soil at an off-site facility. The TPH-contaminated soil will also be re-compacted to a depth of 20 feet below ground surface (bgs) within the building footprint to address potential liquefaction concerns.

Contact Information

Name
Chand Cultana
Agency Name
DTSC
Contact Types
Lead/Public Agency

Location

Cities
South Gate
Counties
Los Angeles
Cross Streets
Santa Fe Avenue/Firestone Blvd.
Zip
90280
Total Acres
18.5
Parcel #
620-4034-900
State Highways
I-105
Railways
UPRR, Alameda Coor.
Airports
No
Schools
SGHS, Stanford ES, etc.
Waterways
No
Township
3S
Range
12W

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print