2015 South Gate Educational Center Master Plan (Formerly 2015 Firestoen Education Center)
12 Documents in Project
Summary
SCH Number
2010121044
Lead Agency
Los Angeles Community College District
Document Title
2015 South Gate Educational Center Master Plan (Formerly 2015 Firestoen Education Center)
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2016
Present Land Use
Z: Heavy Manufacturing
GP: Mixed Commercial/industrial, Subarea 1 South Gate College District
Document Description
Implementation of proposed 2015 South Gate Educational (SGEC) Master Plan consists of the construction of a new satellite campus to replace the existing SGEC, provide expanded and improved educational facilities, and accommodate existing and projected student enrollment. The primary differences between the 2013 Master Plan are that Buildings 1 and 3 on the project site would be demolished and that a parking structure would no longer proposed to be constructed on site. In lieu of the parking structure, additional surface parking would be provided on-site. Consistent with 2013 Master Plan, Building 2 would remain on-site Building 4 would be demolished, and a new approx. 100,000 gross sq. ft., three-story educational building will be constructed.
Contact Information
Name
Thomas Hall
Agency Name
Los Angeles Community College District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
South Gate
Counties
Los Angeles
Cross Streets
Santa Fe Avenue/Firestone Blvd.
Zip
90280
Total Acres
18.5
Parcel #
620-4034-900
State Highways
I-105
Railways
UPRR, Alameda Coor.
Airports
No
Schools
SGHS, Stanford ES, etc.
Waterways
No
Township
3S
Range
12W
Notice of Determination
Approving Agency
Los Angeles Community college District Board of Trustees
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.