See Canyon Slip-out Repair Project; ED09-183 (245R12B565)

3 Documents in Project

Summary

SCH Number
2010121024
Lead Agency
San Luis Obispo County
Document Title
See Canyon Slip-out Repair Project; ED09-183 (245R12B565)
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2011
Present Land Use
Existing County-maintained roadway/ Agriculture, Rural Lands
Document Description
County of San Luis Obispo, Department of Public Works will stabilize an eroded bank of See Canyon Creek adjacent to See Canyon Rd by constructing an ~ 48 ft long soldier pile wall. The wall would be constructed by installing seven steel "H-piles," in combination with concrete or steel lagging panels between each set of piles. The piles will range in length from ~ 25 to 55 feet. Once the piles are installed, the tops will be ~ even with the road surface. Work is planned to occur during the dry season, and construction will be isolated from stream flow via temporary coffer dams and a culvert.

Contact Information

Name
Eric Wier
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Cross Streets
See Canyon Rd and San Luis Bay Dr
Zip
93424
Total Acres
0.15
State Highways
Hwy 101
Schools
Bellevue-Santa Fe
Waterways
See Canyon Ck, San Luis Obispo Ck, Pacific Ocean
Township
31S
Range
12E
Base
MDB&M
Other Location Info
City/Nearest Community: Avila Beach

Notice of Determination

Approving Agency
San Luis Obispo County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print