City Dock No. 1 Marine Research Center Project

4 Documents in Project

Summary

SCH Number
2010121013
Lead Agency
Port of Los Angeles
Document Title
City Dock No. 1 Marine Research Center Project
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2013
Present Land Use
Land Use = Commercial, Industrial/Non-Hazardous, General/Bulk Cargo. Zoning = (Q)M2, (Q)M3
Document Description
The proposed Project is located in the Port of Los Angeles, near the San Pedro Community in the City of Los Angeles. The proposed project site encompasses Berths 56 through 60 and Berths 70 and 71 within the San Pedro Waterfront Plant area, and is bounded by the East Channel to the west, the Main Channel to the east, 22nd Street to the north, and the open water to the San Pedro Bay to the south. The proposed Project involves development of an urban marine research center within a 28-acre portion of the 400-acre San Pedro Waterfront Master Plan area along the west side of the Los Angeles Harbor's Main Channel.

Contact Information

Name
Kevin Grant
Agency Name
Port of Los Angeles Dept. Environmental Management Division
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Cross Streets
The City Dock No. 1 Project involves the development of an urban marine research center within a
Zip
90731
Total Acres
28
State Highways
SR-47, I-110, 710
Railways
Port of LA Red Car Line
Schools
15th St. ES
Waterways
Los Angeles Harbor
Other Location Info
San Pedro

Notice of Determination

Approving Agency
Los Angeles Harbor Department
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print