San Diego Gas & Electric, South Bay Power Plant Interim Measures

Summary

SCH Number
2010118192
Public Agency
Department of Toxic Substances Control
Document Title
San Diego Gas & Electric, South Bay Power Plant Interim Measures
Document Type
NOE - Notice of Exemption
Received
Posted
11/15/2010
Document Description
San Diego Gas & Electric (SDG&E) is proposing to conduct Interim Measures (IM) at the South Bay Power Plant (SBPP) to mitigate potential risks and hazards to human health and environment from chemicals at six Areas of Concern. The IM activities involve excavation and offsite disposal of soil impacted with total petroleum hydrocarbons, volatile organic compounds, semi-volatile compounds and metals to meet industrial/commercial risk based cleanup goals. The attached Table 1 identifies the clean up goals at the site and it is anticipated that a Land Use Covenant will be placed on the property restricting land use to commercial/industrial.

Contact Information

Name
Violeta Mislang
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Chula Vista
Counties
San Diego

Notice of Exemption

Exempt Status
Other
Type, Section or Code
15061(b)(3)
Reasons for Exemption
General Rule The removal action is consistent with the regulation since it will eliminate the threat of a release, reduce potential risk for future site occupants and future workers, and will improve groundwater quality at the site.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.