Wentworth Springs Road at Gerle Creek Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2010112064
Lead Agency
El Dorado County
Document Title
Wentworth Springs Road at Gerle Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2012
Present Land Use
Recreation, Open Space, Forest Lans/Timberland Preserve Zone (TPZ)/ Natural Resources (NR)
Document Description
El Dorado County Department of Transportation intends to replace a bridge previously washed out in 1986 on Wentworth Springs Road at Gerle Creek. The proposed project includes installation of a new 16 foot wide, prefabricated, steel-truss bridge immediately upstream of the existing low-water crossing through Gerle Creek on Wentworth Springs Road. The total Project area is 1.74 acre. The project will eliminate the existing low-water crossing by: (1) replacing a bridge previously destroyed by high flows of Gerle Creek and (2) eliminating vehicular access to the existing low-water crossing. A more detailed project description is in Section 3 of the IS/MND document.

Contact Information

Name
Adam Baughman
Agency Name
El Dorado County DOT
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
On Wentworth Spring Rd over Gerle Creek, about 3.5 miles N of Ice House Rd
Total Acres
1.74
Parcel #
010-04-008
Waterways
Gerle Creek
Other Location Info
City/Nearest Community: Georgetown

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes