Rubicon Trail at Ellis Creek Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2010112063
Lead Agency
El Dorado County
Document Title
Rubicon Trail at Ellis Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2012
Present Land Use
Recreation, Open Space, Forest land/Timberland Preserve Zone (TPZ)/Natural Resources (NR)
Document Description
El Dorado County Department of Transportation intends to install a new 16 foot wide, prefabricated, steel-truss bridge on the Rubicon Trail approximately 60 feet downstream of the existing low-water crossing through Ellis Creek. The total Project area is 1.42 acre. The project will eliminate the existing low-water crossing by: (1) constructing a bridge over Ellis Creek and (2) eliminating vehicular access to the existing low-water crossing. A more detailed project description is in Section 3 of the IS/MND document.

Contact Information

Name
Adam Baughman
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
On Rubicon Trail over Ellis Creek ~ 2.2 miles N of Loon Lake
Total Acres
1.42
Parcel #
010-09-004
Waterways
Ellis Creek
Other Location Info
City/Nearest Community: Georgetown

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes