Rubicon Trail at Ellis Creek Bridge Replacement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010112063
- Lead Agency
- El Dorado County
- Document Title
- Rubicon Trail at Ellis Creek Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/25/2012
- Present Land Use
- Recreation, Open Space, Forest land/Timberland Preserve Zone (TPZ)/Natural Resources (NR)
- Document Description
- El Dorado County Department of Transportation intends to install a new 16 foot wide, prefabricated, steel-truss bridge on the Rubicon Trail approximately 60 feet downstream of the existing low-water crossing through Ellis Creek. The total Project area is 1.42 acre. The project will eliminate the existing low-water crossing by: (1) constructing a bridge over Ellis Creek and (2) eliminating vehicular access to the existing low-water crossing. A more detailed project description is in Section 3 of the IS/MND document.
- Contact Information
-
Adam Baughman
El Dorado County
Lead/Public Agency
2850 Fairlane Court
Placerville, CA 95667
Phone : (530) 621-5913
Location
- Coordinates
- 39°01'22"N 120°18'24"W
- Counties
- El Dorado
- Cross Streets
- On Rubicon Trail over Ellis Creek ~ 2.2 miles N of Loon Lake
- Total Acres
- 1.42
- Parcel #
- 010-09-004
- Waterways
- Ellis Creek
- Other Location Info
- City/Nearest Community: Georgetown
Notice of Determination
- Approving Agency
- El Dorado County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- El Dorado County Offices (Building C, DOT Office), 2850 Fairlane Court, Placerville, CA 95667
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.