Las Posadas Forest Fire Station Replacement Project Mitigated Negative Declaration Addendum

4 Documents in Project

Summary

SCH Number
2010112039
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Las Posadas Forest Fire Station Replacement Project Mitigated Negative Declaration Addendum
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2015
Present Land Use
Forest Fire Station - Zoned as AW (Agricultural Watershed)/ AC (Airport Compatibility)
Document Description
The project consists of the demolition and replacement of an existing forest fire station. Minor changes to the project include a 249 square-foot decrease in the barracks-messhall, an eight square-foot increase in the apparatus building, a 91 square-foot decrease in the generator-pump building, and a 186 square-foot increase in the storage building. All other aspects of the project remain the same, and no substantial changes have occurred that would change the determinations in the original 2011 initial study-mitigated negative declaration.

Contact Information

Name
Chris Browder
Agency Name
Cal Fire
Contact Types
Lead/Public Agency

Location

Counties
Napa
Cross Streets
Las Posadas Road
Zip
94508
Total Acres
1.4
State Highways
no
Railways
no
Airports
Angwin
Schools
Pacific Union College
Waterways
Moore Creek
Township
8N
Range
5W
Section
9
Base
MDB&M
Other Location Info
City/Nearest Community: Angwin

Notice of Determination

Approving Agency
Cal Fire
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print