Maple Street Replacement Facility Project (MSRF)
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010112028
- Lead Agency
- San Mateo County
- Document Title
- Maple Street Replacement Facility Project (MSRF)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/27/2010
- Present Land Use
- As a County Government Facility, the MSRF would be exempt from zoning, but current zoning is Industrial - Restricted
- Document Description
- Proposed MSRF project includes a 768-bed correctional facility and surface parking for 164 vehicles. The MSRF would replace three existing correctional facilities at 1580 and 1590 Maple Street in Redwood City, CA and alleviate overcrowding in a fourth facility in downtown Redwood City, CA. Project construction would require the deconstruction or demolition of existing light industrial buildings on the project site, site preparation and building construction, and utility improvements. In addition, the Sheriff's Office would make minor modification to the Maguire Correctional Facility (MCF) to accommodate changes to existing visitation and support service operations that would occur with operation of the MSRF.
- Contact Information
-
Lieutenant Deborah Bazan
San Mateo County
Lead/Public Agency
455 County Center, 2nd Floor
Redwood City, CA 94063
Phone : (650) 823-7083
Location
- Coordinates
- 37°29'33"N 122°13'09"W
- Cities
- Redwood City
- Counties
- San Mateo
- Cross Streets
- Maple Street and Blomquist Street
- Zip
- 94063
- Total Acres
- 4.69
- Parcel #
- 052-392-190, 200, 210, 240, 260, 270
- State Highways
- US 101
- Railways
- Yes
- Airports
- San Carlos
- Schools
- Orion, Hoover
- Waterways
- Redwood Creek, S.F. Bay
Notice of Determination
- Approving Agency
- County of San Mateo
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- County of San Mateo Planning and Building Department 455 County Center, 2nd Floor Redwood City, CA 94063
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.