Hollister 115 kV Power Line Reconductoring Project
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010111065
- Lead Agency
- Public Utilities Commission, California (California Public Utilities Commission)
- Document Title
- Hollister 115 kV Power Line Reconductoring Project
- Document Type
- MND - Mitigated Negative Declaration
- Received
- Present Land Use
- Grazing, agricultural, rangeland uses.
- Document Description
- Pacific Gas and Electric Company (PG&E), in its California Public Utilities Commission (CPUC) application (A.09-11-016), filed on November 23, 2009, seeks a Permit to Construct the Hollister 115 kV Power Line Reconductoring Project (Proposed Project). PG&E, which currently operates the existing 115 kV overhead electric power line system in Monterey and San Benito Counties, requests to replace structures (e.g., towers and poles) and reconductor the Hollister Tower and Hollister Pole Segments, approximately seven and nine miles long, respectively. The majority of the proposed alignment would be located in an existing PG&E easement on private property; an approximately 1.3-mile section of the 115kV Hollister Pole Segment would be relocated out of the San Benito River floodplain (the existing river alignment) to a new river crossing with structure located on dry banks above the river (the Proposed River Crossing) while the existing distribution and topped poles would remain to serve local users.
- Contact Information
-
Monisha Gangopadhyay
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102-3298
Phone : (415) 703-5484
Location
- Coordinates
- 36°52'18"N 121°24'28"W
- Cities
- Hollister San Juan Bautista
- Counties
- Monterey San Benito
- Cross Streets
- Multiple (Substation at Bolsa Road, San Felipe Road)
- Zip
- 95023
- Parcel #
- Multiple
- State Highways
- Hwy 156, 25, 129, 101
- Railways
- UPRR
- Airports
- Hollister Municipal
- Schools
- Multiple
- Waterways
- San Benito River
Notice of Completion
- Review Period Start
- Review Period End
- Development Type
- Power:Electric Transmission Lines (115 kV Watts)
- Local Action
- Other Action Other Action: PTC permit
- Project Issues
- Aesthetic/Visual Agricultural Land Air Quality Archaeologic-Historic Biological Resources Drainage/Absorption Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Septic System Sewer Capacity Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Wildlife Growth Inducing Land Use Cumulative Effects
- Reviewing Agencies
- Cal Fire California Department of Parks and Recreation California Department of Transportation, District 5 California Energy Commission California Highway Patrol California Native American Heritage Commission California Regional Water Quality Control Board, Central Coast Region 3 California State Lands Commission Caltrans, Division of Aeronautics Department of Water Resources Resources Agency California Department of Fish and Wildlife, Central Region 4
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.