Ace Bowen Pump Station Improvements Project

2 Documents in Project

Summary

SCH Number
2010111055
Lead Agency
Rancho California Water District
Document Title
Ace Bowen Pump Station Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
1/8/2011
Present Land Use
Rural Mountains, R-A-20 (Residential Agricultural)
Document Description
The Ace Bowen Pump Station currently operates pumps using both electric motor drivers and internal combustion (IC) engine drivers. The existing electric motor driven pumps consist of three 350 horsepower (hp)pumps and four 250 hp pumps, while the existing IC engine driven pumps are powered by natural gas and consist of six 500 hp pumps each driven by 634 hp engines. Two of the IC engine driven pumps and two of the 250 hp motor driven pumps serve the 1440 PZ. As currently configured, these pumping systems are capable of delivering approximately 24 cfs of potable water to the 1440 PZ. The other two IC engine driven pumps along with three 350 hp and two 250 hp motor driven pumps serve the 1670 PZ. As currently configured, these pumping systems are capable of delivering approximately 45 cfs of potable water to the 1670 PZ. Rancho California Water District proposes to make improvements at its Ace Bowen Pump Station which include: replacing internal combustion engine pump drivers with electric motor pump drivers; adding fuel cell technology for on-site electric power generation from natural gas; adding a new road to provide all-weather access to the pump station; adding one or more reverse osmosis (RO) concentrate storage tanks to store RO concentrate prior to disposal; and adding associated electrical and communication/instrumentation systems.

Contact Information

Name
Corey Wallace
Agency Name
Rancho California Water District
Contact Types
Lead/Public Agency

Location

Cities
Temecula
Counties
Riverside
Cross Streets
Via Santa Rosa and Calle Cuesta
Total Acres
2.6
Parcel #
940-230-002
State Highways
I-15, Hwy 79
Railways
no
Airports
no
Schools
no public schools, private K-8 schools
Waterways
Temecula Creek, Murrieta Creek, Santa Margarita River
Township
8S
Range
3W
Section
13,14
Base
SBB&M
Other Information
Section: 23

Notice of Determination

Approving Agency
Rancho California Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print