Stream Alteration Agreement No. 1600-2011-0041-R4 for the Mountain Road M319 Bridge Replacement Project

4 Documents in Project

Summary

SCH Number
2010111046
Lead Agency
Tulare County
Document Title
Stream Alteration Agreement No. 1600-2011-0041-R4 for the Mountain Road M319 Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/29/2011
Present Land Use
Not applicable - Tulare County Right-of-Way
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the replacement of Bridge No. 46C0119 on Mountain Road M319 over the South Fork Kaweah River. The bridge replacement would consist of removing the existing single-lane structure of approximately 60 feet in length and 12 feet in width, and replacing it on its existing alignment with pre-cast, pre-stressed box and girder bridge, approximately 80 feet long and 22 feet wide. The California Department of Fish and Game has determined the Project is subject to regulation pursuant to Fish and Game Code Section 1600 et seq.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Tulare
Cross Streets
Mountain Road M319 (Grouse Valley Road) ~0.2 miles S of S Fork Dr.
Zip
93277
Parcel #
114-060-008, 010, 031, 032, 044
State Highways
SR-198
Waterways
South Fork Kaweah River
Township
18S
Range
29E
Section
16
Base
MDB&M
Other Location Info
City/Nearest Community: Three Rivers

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print