Post Creek Trail Construction

Summary

SCH Number
2010108070
Lead Agency
Parks and Recreation, Department of (California Department of Parks and Recreation)
Document Title
Post Creek Trail Construction
Document Type
NOE - Notice of Exemption
Received

Document Description
Construct an approximately .75 mile long Post Creek Trail at Pfeiffer Big Sur State Park to allow visitors to hike to the nearest commercial area in Big Sur along a safe trail in the redwoods. Trail construction work will brush and clear vegetation, excavate trail surface and install rock crib retaining walls, open rock culverts, rock ripraps, and soldier piles with lagging and retaining walls. Trails will then be re-surfaced with crushed aggregate. Work crew will follow the Departmental Trail Guidelines Best Management Practices to prevent inadvertent spoils from soil surface at the sign locations; excavate and install concrete footings in holes measuring approximately 2 foot wide by 3 foot deep to install four (4) signs to provide visitors with park information in safe, visible locations.

Contact Information
Jill Poudrette
California Department of Parks and Recreation
Monterey District 2211 Garden Road
Monterey, CA 93940

831 649-2980

Location

Counties
Monterey
Other Location Info
Pfeiffer Big Sur State Park

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15303, 15304 - Class 3&4
Reasons for Exemption
Project consists of construction and location of limited numbers of new, small facilities or structures and minor public alterations in the condition of land and vegetation that do not involve the removal of healthy, mature trees; included as "trail construction or realignment" in the Department of Parks and Recreation's list of exempt activities, in accordance with CCR section 15300.4.
Download CSV New Search