Village 1 Specific Plan Project - Final Approval of the General Development Plan (GDP) Ordinance (Lake or Streambed Alteration Agreement No. 1600-2016-0130-R2)
29 Documents in Project
Summary
SCH Number
2010102018
Lead Agency
City of Lincoln
Document Title
Village 1 Specific Plan Project - Final Approval of the General Development Plan (GDP) Ordinance (Lake or Streambed Alteration Agreement No. 1600-2016-0130-R2)
Document Type
NOD - Notice of Determination
Received
Posted
2/16/2017
Present Land Use
GP (County): Agriculture/Timberland, Rural Residential
GP (City): Village, Public Facilities
Z (County): Residential Agriculture, Farming
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0130-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Lincoln.
Project is limited to the extension of the existing culvert, placement of a new culvert, installation of two utility pipes (for water and sewer), widening of the road (Oak Tree Lane), removal of riparian trees, and replanting of native trees on North Ingram Slough. The project will remove all vegetation within the limit of work around the existing crossing.
The existing 48-inch culvert will be extended to the new limits of the widened Oak Tree Lane. The total new length of the existing 48-inch culvert will be approx. 112 feet after construction. A new 12'x5' arch pipe culvert will be installed and backfilled with structural fill.
The upstream and downstream end of the new culvert, as well as existing 48-inch extended culvert will be provided with a concrete headwall and rip-rap to prevent scour.
Two trenches will be excavated in the location of the rip rap to accommodate the installation of two pipes, one for a waterline and the other for a sewer line. Both utility lines will be backfilled and compacted with engineered soil and topped with rip rap to ensure that they are not exposed in the future.
Once construction of the new Oak Tree Lane is completed, revegetation and bank stabilization will occur. All work is anticipated to be completed while the drainage is dry and stabilization and revegetation will occur before the drainage becomes inundated.
Contact Information
Name
Gina Ford
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lincoln
Counties
Placer
Cross Streets
SR 193, Virginiatown Rd, Sierra College Blvd
Total Acres
1,832
Parcel #
various
State Highways
SR 108
Waterways
Auburn Ravine Creek
Township
3N
Range
6E
Section
13
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.