Klamath River Bridge Hinge Replacement Project

4 Documents in Project

Summary

SCH Number
2010102013
Lead Agency
California Department of Transportation, District 1
Document Title
Klamath River Bridge Hinge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2011
Present Land Use
None-project is located within State of California owned highway right-of-way.
Document Description
The project would replace three bridge hinges on the Klamath River Bridge. Work would include the demolition and reconstruction of the three hinges, installation and removal of temporary supports and temporary foundations, and the temporary relocation of utilities. Approximately 25 feet of bridge, bridge deck, and bridge rail would be reconstructed at each hinge location. In addition, a methacrylate seal and traffic striping would be placed on the bridge deck, and a 12 inch by 12 inch by 1 inch concrete section of bridge would be repaired.

Contact Information

Name
Steve Croteau
Agency Name
California Department of Transportation (Caltrans)
Contact Types
Lead/Public Agency

Location

Counties
Del Norte
Cross Streets
Project located on SR-101 at Post Mile 4.04/4.42
Zip
95548
Total Acres
4.7
Parcel #
None-State of California Owned
State Highways
SR 101
Railways
no
Airports
no
Schools
no
Waterways
Klamath River
Township
13N
Range
01E
Section
14
Base
HB&M
Other Location Info
City/Nearest Community: Klamath

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No