Dixon Station 10 Water Storage Tanks project-California Water Service

2 Documents in Project

Summary

SCH Number
2010102009
Lead Agency
California Department of Public Health (CDPH)
Document Title
Dixon Station 10 Water Storage Tanks project-California Water Service
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2010
Present Land Use
CS - Commercial Services
Document Description
The California Water Service Company proposes to construct and operate two new portable water tanks to serve its Dixon District. The new welded steel tanks will provide for a combined capacity of approximately 1.1 million gallons. Tank 1 will be approximately 57 feet in diameter and 32 feet high; Tank 2 will be approximately 64 feet in diameter and 32 feet high. The project would also include ancillary facilities such as perimeter fencing, a booster pump station, a back-up generator, and a new electrical panel board. The new facilities would be linked via 16-inch diameter pipes which would extend southerly to an existing 16-inch water tank inlet and outlet connection pipeline on West F Street. Two catch basins would be provided for overflows from each tank. The back-up generator and electrical panel board would be located to the south og Tank 1, with the electrical panel board housed in a 112 sq ft electrical panel box footprint.

Contact Information

Name
Betty Graham
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Dixon
Counties
Solano
Cross Streets
620 North Jackson St.
Zip
95620
Parcel #
0113-073-110/120/240
State Highways
SR-113, I-80
Railways
1
Schools
Numerous

Notice of Determination

Approving Agency
California Department of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.