PG&E Gas Pipeline 303 in Line Inspection and Repair Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010102001
- Lead Agency
- State Water Resources Control Board
- Document Title
- PG&E Gas Pipeline 303 in Line Inspection and Repair Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/21/2010
- Present Land Use
- Site 3 Pasture Land Site 1 & 2 Pasture Land/ Open Space
- Document Description
- Excavate three sites on existing pipeline, inspect and repair as needed. Each site has a 50' by 50' work area and temporary overland access routes, each less than 500' in length. Mitigation includes protection of special status plants, wildlife, wetlands and one alkali swale.
- Contact Information
-
Cliff Harvey
State Water Resources Control Board Division of Water Quality
Lead/Public Agency
1001 I Street, 15th Floor
Sacramento, CA 95814
Phone : (916) 558-1709
Location
- Cities
- Livermore
- Counties
- Alameda Contra Costa
- Cross Streets
- North and South of Camino Diablo Road, Ames and Raymond Road
- Total Acres
- .842
- State Highways
- Hwy 4, 580
- Section
- Variou
- Other Location Info
- City/Nearest Community: Brentwood
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- State Water Resources Control Board, Division of Water Quality 1001 I Street, 15th Floor Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.