Revision to Badlands Landfill Solid Waste Facility Permit (SWFP) No. 33-AA-0006 and Joint Technical Document (JTD) No. 7
7 Documents in Project
Summary
SCH Number
2010101090
Lead Agency
Riverside County
Document Title
Revision to Badlands Landfill Solid Waste Facility Permit (SWFP) No. 33-AA-0006 and Joint Technical Document (JTD) No. 7
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2015
Present Land Use
Existing sanitary landfill; W-2(Controlled Development)
Document Description
The proposed project revises SWFP 33-AA-0006, to include the following landfill operational and administrative modifications, as identified in JTD No. 7: 1) add Sunday operations; 2) accept state-regulated non-hazardous asbestos-containing waste for disposal; 3) increase total disposal capacity through grading modifications that include an engineered plug; 4) revise the disturbance limit boundaries; 5) accept non-hazardous high moisture content waste and recirculate landfill leachate and landfill gas condensate; 6) accept non-hazardous sludge for disposal; 7) modify the daily permitted disposal capacity from 4,000 tons per day to 4,500 tpd; 8) modify the daily permitted greenwaste/ADC/other material used for beneficial re-use from 800 tpd to 300 tpd and, 9) revise acceptance of treated wood waste from 30 tpd to 130 tons per month.
Contact Information
Name
Ryan Ross
Agency Name
Riverside County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Moreno Valley
Counties
Riverside
Cross Streets
Theodore St. and Ironwood Ave
Parcel #
413-140-023,-024,-030,-033,-034,-036
State Highways
Hwy 60
Township
2S
Range
2W
Section
31,32
Base
SBB&M
Notice of Determination
Approving Agency
Riverside County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.