Addition of CDA Expanded TCE Treatment Program
11 Documents in Project
Summary
SCH Number
2010101061
Lead Agency
Chino Basin Municipal Water District
Document Title
Addition of CDA Expanded TCE Treatment Program
Document Type
NOD - Notice of Determination
Received
Posted
6/9/2015
Document Description
In January 2011 the Chino Basin Desalter Authority (CDA) adopted a Mitigated Negative Declaration (MND) for the Chino Desalter Phase 3 Expansion Project (original project) and approved implementation of the project. Over the next several years the CDA assembled funding, including federal funding from the Bureau of Reclamation, and CDA has proceeded to implement the original project. When considered at the broadcast level, the Phase 3 Expansion Project is being implemented to take groundwater with various levels of contamination in the southern portion of the Chino Basin and treat it to remove the contamination to levels below a threshold that allows the groundwater to be delivered to CDA member agencies as potable water.
The CDA presently operates Chino Desalter I and Chino Desalter II. These existing facilities convert contaminated groundwater, primarily with nitrate or total dissolved solids at unacceptable levels for drinking water, to potable quality water. The Phase 3 project objective was and is to expand groundwater extraction to meet the objective of delivering 20.5 million gallons of potable water per day (MGD), approximately 14,236 gallons per minute (GPM) of production).
Contact Information
Name
Curtis Paxton
Agency Name
Chino Basin Desalter Authority
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fontana, Ontario
Counties
San Bernardino
Cross Streets
S. portion of Chino Basin, generally S. of SH 60 & N. of Prado Basin
State Highways
Hwy 60
Railways
UPRR
Airports
Chino Airport
Waterways
Santa Ana River
Notice of Determination
Approving Agency
Chino Basin Desalter Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.