County File Numbers: DRC2008-00021 and LRP2008-00011

6 Documents in Project

Summary

SCH Number
2010101031
Lead Agency
San Luis Obispo County
Document Title
County File Numbers: DRC2008-00021 and LRP2008-00011
Document Type
NOD - Notice of Determination
Received
Posted
12/29/2010
Present Land Use
Rural Lands
Document Description
Request by Coastal Christian School for a Land Use ordinance Amendment (LRP2008-00011) and a Conditional use Permit (DRC2008-00021) to allow the phased development of a private K-12 school. The proposal would involve an amendment to Section 22.106.020F.2 of the Land Use Ordinance to allow the proposed school to be served by an on-site well, rather than municipal water service. The Conditional Use Permit would authorize grading for (with site disturbance of approximately 15.74 acres) and construction of approximately 85,852 square feet in school buildings and ancillary outdoor facilities (e.g. sports fields, pool, parking lots, gardens, etc.). The proposal also includes a request for an adjustment to the 35-foot height limitation to allow the gymnasium building to have a height of approximately 36 feet, 6 inches. Construction would occur in eight phases over a 10-year period. Upon completion of the first phase, the school will serve approximately 200 students with 20 faculty/staff members; at build out, the school will serve approximately 600 students with 50 faculty/staff members. The project will result in approximately 15.74 acres of site disturbance over a 26.8-acre parcel. The project is located on the west side of Oak Park Boulevard between James Way and Noyes Road, (at 705 North Park Boulevard). The site is immediately adjacent to the city limits of Pismo Beach and Arroyo Grande. The site in the San Luis Bay (Inland) Planning Area.

Contact Information

Name
John Mack
Agency Name
San Luis Obispo Department of Planning and Building
Contact Types
Lead/Public Agency

Location

Cities
Arroyo Grande, Pismo Beach
Counties
San Luis Obispo
Cross Streets
Oak Park Blvd/Noyes Road
Zip
93449
Total Acres
26.8
Parcel #
079-260-002
State Highways
Hwy 227, 101
Railways
UPRR
Schools
Lucia Mar USD
Waterways
Meadow Creek, Pismo Lake

Notice of Determination

Approving Agency
San Luis Obispo County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print