Russian River Bank Stabilization at Highway 128 Bridge

Summary

SCH Number
2010098251
Public Agency
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa
Document Title
Russian River Bank Stabilization at Highway 128 Bridge
Document Type
NOE - Notice of Exemption
Received
Posted
9/23/2010
Document Description
Caltrans replaced the Highway 128 Bridge over the Russian River in 2006 after one of the bridge piers failed. The bridge was closed from January 2006 through August 2006 during emergency bridge replacement/construction. In January 2010, Caltrans completed an emergency bank stabilization project along the upstream side of the western approach to the new bridge that consisted of placing approximately 500 cubic yards of rock slope protection (RSP) streambank during high winter flows. An additional 2,00 cubic yards of RSP was placed on the top of the eroding bank and against the bridge approach fill as an erodible buttress in the event that the 500 cubic yards that were placed in the river was insufficient to prevent further erosion.

Contact Information

Name
Dean Prat
Agency Name
Regional Water Quality Control Board, Region 1 (North Coast), Sa
Contact Types
Lead/Public Agency

Location

Counties
Sonoma
Other Location Info
Geyserville

Notice of Exemption

Exempt Status
Emergency Project
Type, Section or Code
21080(b)(4); 15269(b)(c)
Reasons for Exemption
The project involves specific actions necessary to prevent and mitigate an emergency situation that has a high probability of occurrence in the short-term.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print