Normal Heights Elementary School - Central Plant Completion Project
Summary
- SCH Number
- 2010098167
- Lead Agency
- San Diego Unified School District
- Document Title
- Normal Heights Elementary School - Central Plant Completion Project
- Document Type
- NOE - Notice of Exemption
- Received
- Posted
- 9/13/2010
- Document Description
- During project activities occurring under Proposition MM, the school's central plant was designed but not completed during comstruction. The chilled water piping, chiller, and fan coils were not installed; therefore, the school has heating but no air conditioning. Under this Proposition S project, the completed design is to be verified and the chilled water piping, chiller, and fan coils will be installed. Project activities would occur in developed and/or previously disturbed areas.
- Contact Information
-
James H. Watts
San Diego Unified School District
4860 Ruffner Street
San Diego, CA 92111
Phone : (858) 627-7241
Location
- Cities
- San Diego
- Counties
- San Diego
Notice of Exemption
- Exempt Status
- Categorical Exemption
- Type, Section or Code
- 15303(e)
- Reasons for Exemption
- The proposed project will be located on the existing elementary school campus in an area where ground disturbance has previously occurred. The project is an appurtenant structure to the existing school facility.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.