Replacement of Existing Bridge

Summary

SCH Number
2010098061
Lead Agency
Planning and Research, Office of (Office of Planning and Research)
Document Title
Replacement of Existing Bridge
Document Type
NOE - Notice of Exemption
Received

Document Description
The proposed project includes the replacement of the existing Cathedral Bridge with a new clear span, prefabricated steel beam and truss bridge. Supporting cast-in-place concrete piers will be placed at the upper banks of Lockhart Gulch; abutments for the bridge would be placed at the top edge of the creek bank. The existing piers will be removed with a long-reach excavator from above the creek channel using cable and chain to secure and move the piers. There may need to be some hand digging around the pier footings to loosen them such that they can then be hoisted out with the crane.

Contact Information
Suzanne DeLeon
California Department of Fish and Game
P.O. Box 47
Yountville, CA 94559

831 440-9433

Location

Cities
Scotts Valley
Counties
Santa Cruz

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302 - Class 2
Reasons for Exemption
Replacement of an existing structure.
Download CSV New Search