SATCOM Regional Hub Node Project

Summary

SCH Number
2010094006
Lead Agency
U.S. Army
Document Title
SATCOM Regional Hub Node Project
Document Type
EA - Environmental Assessment
Received

Document Description
NOTE: Review Per Lead The United States Army Program Manager Defense Communications and Army Transmission System proposes to construct a Regional Hub Node, which includes the construction or installation of the three 9.2-meter Ku-Band antennas; communication baseband equipment racks; heating, ventilation, and air conditioning units; and cable ladders. The RHN would be capable of supporting data, voice, and video satellite communication links in support of world-wide operations. The three satellite antennas would be constructed at an existing asphalt hellpad on the top of a hill at the SATCOM site. In order to make room for the antennas, modification of the hellpad hilltop would be required.

Contact Information
Curt Lyson
U.S. Army
Building 359
Fort Monmouth, NJ 07703-5509

(732) 532-5180

Location

Cities
Paso Robles
Counties
San Luis Obispo
Cross Streets
Camp Roberts Army National Guard Installation
Zip
93451
Total Acres
0.97
State Highways
Hwy 101 (El Camino Real)

Notice of Completion

Review Period Start
Review Period End
Development Type
Other (Military/construction of antennas)
Project Issues
Cumulative Effects Landuse Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Soil Erosion/Compaction/Grading Noise Geologic/Seismic Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality Aesthetic/Visual
Reviewing Agencies
California Department of Parks and Recreation California Highway Patrol California Public Utilities Commission Caltrans, District 5 Caltrans, Division of Aeronautics Department of Fish and Wildlife, Region 4 Department of Water Resources Native American Heritage Commission Regional Water Quality Control Board, Region 3 Resources Agency
Download CSV New Search