Smartville Road - Vineyard Creek Bridge Replacement
2 Documents in Project
Summary
SCH Number
2010092075
Lead Agency
Yuba County
Document Title
Smartville Road - Vineyard Creek Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2011
Present Land Use
Existing Bridge; "RZ" Recreational Zone; Open Space/Recreation
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2011-0048-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Yuba County Department of Public Works.
The project is limited to removal of an existing bridge spanning the creek, creation of a temporary detour road with an 18 inch diameter CMP culvert to reroute any water from the creek around the work site. Construction of a new bridge that will consist of three separate spans totaling approximately 90 feet in total length, construction of two bridge abutments with spread footings for the end spans of the bridge and construction of two concrete pier walls for the centers ends of the two outer spans and both ends of the center span to rest on.
Contact Information
Name
Robert C. Hosea
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Yuba
Cross Streets
Waldo Road
Airports
Beale AFB
Waterways
Vineyard Creek
Township
15N
Range
6E
Section
21
Base
MDB&M
Other Location Info
City/Nearest Community: Smartsville
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.