Lost Creek Dam Improvements Project
6 Documents in Project
Summary
SCH Number
2010092056
Lead Agency
South Feather Water and Power Agency
Document Title
Lost Creek Dam Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
4/29/2011
Present Land Use
Timber Preserve, Commercial
Document Description
The Lost Creek Dam Improvement Project (LCDIP) would modify Lost Creek Dam, a component of the South Feather Power Project, FERC Project No. 2088-CA, to meet Probable Maximum Flood design and safety requirements established by FERC and the California Division of Safety of Dams. Modifications would include lowering the spill crest, raising the dam crest, and reinforcing/adding concrete to the downstream face of the dam to resist loads. The LCDIP would remove the roadway and bridge structure over the dam, construct a concrete batch plant nearby in Yuba County, establish a construction staging area, improve approximately 3-5 miles of roadway (between the proposed batch plant site, construction staging areas, and the dam), and entail approximately 1,000 truck roundtrips over two construction seasons (~ 8 months each).
Contact Information
Name
Kathy Zancanella
Agency Name
South Feather Water and Power Agency
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Butte, Yuba
Cross Streets
Barton Hill Rd, Lost Creek Dam Rd, Mooreville Ridge Rd, Binet Rd, La Porte Rd
Zip
95930,9598
Total Acres
<10
Parcel #
073-080-009-000
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
Lost Creek
Township
20N
Range
7E
Section
24
Other Location Info
City/Nearest Community: Strawberry Valley, Clipper Mills
Notice of Determination
Approving Agency
South Feather Water and Power Agency
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.