RIVER BEND CAMP FIRE DAY CAMP MASTER PLAN

2 Documents in Project

Summary

SCH Number
2010092024
Lead Agency
Sacramento County
Document Title
RIVER BEND CAMP FIRE DAY CAMP MASTER PLAN
Document Type
NOD - Notice of Determination
Received
Posted
12/7/2022
Document Description
The River Bend Camp Fire Day Camp project will include the removal of two concrete block structures and floor slabs, dead vegetation, chain link perimeter fencing, broken benches, broken picnic tables and trash. Construction items will include the installation of a prefabricated solar-powered reinforced concrete restroom/shower building with a new septic system; installing a prefabricated reinforced concrete storage building; creating ADA compliant parking, walks and picnic table pads; renovating or repairing existing picnic tables and benches and installing new barbeque grills; terracing an existing communal fire pit area with railroad tie retaining walls; erecting group shelters; installing new fencing and entry gates; installing a flagpole, interpretive signs and an information kiosk

Contact Information

Name
Joelle Inman
Agency Name
Sacramento County Planning
Job Title
ENVIRONMENTAL COORDINATOR
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
076-0010-004

Notice of Determination

Approving Agency
Sacramento County Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print