Colma Creek Flood Control Channel Wall Repair Project ND/IS

3 Documents in Project

Summary

SCH Number
2010092005
Lead Agency
San Mateo County
Document Title
Colma Creek Flood Control Channel Wall Repair Project ND/IS
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2011
Present Land Use
Flood control channel/P1-Planned Industrial District/Public
Document Description
The temporary bracing pipes spanning the creek channel will be removed and a U-shaped wall and concrete bottom slab will be constructed. The proposed U-shaped wall construction would require temporary construction support and dewatering. Temporary support would be provided by steel sheet piles driven to adequate depths below the excavation and potential horizontal bracing for the sheet piles on the channel side. Dewatering wells and pumps will be placed on both the north and south sides of the channel to dewater the site. Cofferdams will be temporarily installed up- and downstream of the project construction area. The CDFG is executing a Lake and Streambed Alteration Agreement Number 1600-2010-0370-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, San Mateo County.

Contact Information

Name
Suzanne DeLeon
Agency Name
CDFG
Contact Types
Lead/Public Agency

Location

Cities
South San Francisco
Counties
San Mateo
Cross Streets
Spruce Ave and Canal Street
Zip
94080
Parcel #
014-052-010; and 014-062-010
State Highways
Hwy 101
Railways
Union Pacific/CalTrain
Airports
SFO
Schools
S. San Francisco HS
Waterways
Colma Creek

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.