Sylmar Ground Return System Replacement Project

7 Documents in Project

Summary

SCH Number
2010091044
Lead Agency
City of Los Angeles
Document Title
Sylmar Ground Return System Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/6/2016
Document Description
The proposed new underwater electrode array would be about 2 miles offshore directly on the ocean floor at a depth of about 100 feet below mean sea level. Based on a preliminary design, the electrode array would be composed of 36 concrete vaults, 144 electrodes, marine cables, and other related structures,. Each approx. 20-ton vault would be 20 feet long, 8 feet wide, and 4 feet high. The vaults would be arranged in two rows of 18 vaults. Each vault and row would be spaced approx. 30 feet apart. The State Lands Commission action is an approval of a 20-year General Lease - Industrial Use through Dec. 5, 2036.

Contact Information

Name
Cheryl Hudson
Agency Name
CA State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Pacific Coast Hwy and Sunset Blvd.
State Highways
Pacific Coast Hwy
Schools
Multiple
Waterways
Santa Monica Bay
Other Location Info
Pacific Palisades

Notice of Determination

Approving Agency
State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print