Sylmar Ground Return System Replacement Project

6 Documents in Project

Summary

SCH Number
2010091044
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Sylmar Ground Return System Replacement Project
Document Type
FIN - Final Document
Received

Document Description
The Los Angeles Dept. of Water and Power is proposing to replace the existing marine cables and the marine electrode portions of the Sylmar Ground Return System. The proposed marine facility would originate at the existing Gladstone Vault, from this location, the new marine cables would extend to a new electrode array in the Santa Monica Bay. The marine cables would be installed several feet beneath the ocean floor by means of a water-jet plow to the site of the proposed electrode array, approx. 2 miles offshore. The electrode array would be located on the ocean floor at a depth of approx. 100 feet below mean sea level and consist of 36 concrete vaults, arranged in two rows of 18 vaults. Each vault is 20 feet long 8 feet wide, and four feet high.

Contact Information
Nancy Chung
City of Los Angeles Department of Water and Power
111 North Hope Street
Los Angeles, CA 90012

213-367-0404

Location

Coordinates
34°02'18.1"N 118°33'19.1"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
Pacific Coast Hwy and Sunset Blvd.
State Highways
Pacific Coast Hwy
Schools
Multiple
Waterways
Santa Monica Bay
Other Location Info
Pacific Palisades

Notice of Completion

Development Type
Power:Other Power Type (Ground return)
Project Issues
Cumulative Effects Wetland/Riparian Water Quality Vegetation Traffic/Circulation Recreation/Parks Noise Coastal Zone Biological Resources Archaeologic-Historic
Download CSV New Search