Maple Lane Drainage and Sidewalk Improvements

3 Documents in Project

Summary

SCH Number
2010091043
Lead Agency
San Bernardino County
Document Title
Maple Lane Drainage and Sidewalk Improvements
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2012
Present Land Use
drainage channel and roadway, Bear Valley RS-10
Document Description
CDFG is executing a Streambed Alteration Agreement (SAA # 1600-2012-0170-R6) pursuant to Section 1602 of the Fish and Game code to the project Applicant: San Bernardino County Department of Public Works, represented by John Schatz, 825 E. Third Street, San Bernardino, CA 92415. The Project is limited to the installation of 1,230 linear feet of a 48-inch pipe and 100 feet of a 24-inch pipe within the drainage ditch east of Maple Lane and reconstruction of drainage swale over the pipe to allow capturing locally generated storm flows; the construction of a 600-square foot velocity splash pad comprised of 1-ton ungrouted rock rip-rap located at the outlet of the 48-inch pipe and construction of four 100-square foot energy dissipating 1/4-ton ungrouted rock rip rap splash pads at various stages along the channel; the construction on the west side of Maple Lane of an approximately 60 linear feet oversize drain and capture of a 0.5-acre earthen detention basin near the southwest corner of Maple Lane and State Route 38; and the construction of a 2,680 linear feet, 6-foot wide dirt sidewalk and the widening of Maple Lane a maximum of 10 feet to smooth and straighten a curve along the eastern edge of Maple Lane.

Contact Information

Name
Juan Lopez Torres
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Cross Streets
State Highway 38 at Maple Lane
Zip
92314
Total Acres
3.4
Parcel #
0312-421-43
State Highways
Hwy 38, 18
Railways
No
Airports
Big Bear City
Schools
Big Bear High School
Waterways
Baldwin Lane, Big Bear Lake
Township
2N
Range
1E
Section
13
Base
SBB&M

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.