Al Larson Boat Shop Improvement Project

3 Documents in Project

Summary

SCH Number
2010091041
Lead Agency
Port of Los Angeles
Document Title
Al Larson Boat Shop Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2012
Present Land Use
[Q]M3-1 Heavy Industry
Document Description
The proposed Project involves redeveloping the existing Al Larson Boat Shop (ALBS) to modernize the facility and to improve its ability to build and repair ships and vessels. Improvements would include maintenance dredging to ensure adequate vessel access to the site, beneficially reuse dredged material by constructing two confirmed disposal facilities (CDF) which would not result in ~1 acre of new land for increased vessel maintenance and repair, demolition of some existing buildings, and construction of new office building, constructiong new wharves, and installing a new travel-lift boat hoist. In addition, the proposed Project would improve the site's runoff (hydrology and water quality) and remediate historical sediment and soil contamination.

Contact Information

Name
Dennis Hagner
Agency Name
City of Los Angeles Harbor Department
Contact Types
Lead/Public Agency

Location

Cities
Long Beach, Los Angeles
Counties
Los Angeles
Cross Streets
Seaside Ave and Wharf St
Zip
90731
Total Acres
7.7
State Highways
SR 47
Railways
Pacific Harbor Belt Line
Airports
No
Schools
Port of Los Angeles HS
Waterways
Los Angeles Harbor

Notice of Determination

Approving Agency
Los Angeles Harbor Department
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print