Donlon Road Realignment Project
4 Documents in Project
Summary
SCH Number
2010091013
Lead Agency
Ventura County
Document Title
Donlon Road Realignment Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Vacant land/Agricultural Exclusive (AE-40acre)/Agriculture (40 acre Minimum)
Document Description
The project involves the realignment of the Donlon Road/SR 118 intersection to align Donlon Road with Somis Road. The County is considering two alternative alignments. Both of the proposed roadway realignments traverse an existing nursery and cross over Coyote Canyon Creek. Both alternatives would require the establishment of a new right-of-way through the nursery that would connect to Donlon Road to the north and to SR 118/Somis Road intersection to the south. The alignment would cover between 0.64 and 0.74-acres depending on the alternative selected.
Contact Information
Name
Alison Sweet
Agency Name
Ventura County Public Works Agency
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Ventura
Cross Streets
Somis Road/State Route 188; Donion Road/La Cumbre Road
Zip
93066
Total Acres
0.74
State Highways
Hwy 118
Railways
Metrolink
Schools
Somis ES
Waterways
Coyote Canyon Creek
Other Location Info
City/Nearest Community: Somis
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), Department of Toxic Substances Control, Department of Water Resources, Resources Agency, California Department of Transportation, District 7 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 7 (DOT)
Development Types
Transportation:Local Road (Roadway Alignment)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.