Approval of the Installation Restoration Site 15(IR15) Feasibility Study/Remedial Action Plan, within Investigation Area C1, Lennar Mare Island, Vallejo,CA

2 Documents in Project

Summary

SCH Number
2010082083
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Approval of the Installation Restoration Site 15(IR15) Feasibility Study/Remedial Action Plan, within Investigation Area C1, Lennar Mare Island, Vallejo,CA
Document Type
NOD - Notice of Determination
Received

Document Description
Preparation and approval of the Revised Draft for Public Review IR15 Feasibility Study/Remedial Action Plan, Investigation Area C1, Lennar mare Island, Vallejo, California (FS/Rap) by the State of California Environmental Protection Agency, Department of Toxic Substances Control (DTSC). The FS/RAP proposes remediation of soil and groundwater contamination at Installation Restoration Site 15 (IR 15). This area is part of a larger parcel (called the Easter Early Transfer Parcel) that was transferred from the Unite State Department of Navy to Lennar Mare Island, LLC (LMI). The FS/RAP in incorporated by reference.

Contact Information
Janet Naito
Department of Toxic Substances Control
Brownfields and Environmental Restoration Program Berkeley Offic 700 Heinz Avenue
Berkeley, CA 94710

510-540-3833

Location

Coordinates
38°6'4.9824"N 122°16'12.9252"W
Cities
Vallejo
Counties
Solano
Cross Streets
Waterfront Ave, Kansas Street, Arizona Street
Zip
94592
Total Acres
3.5
Parcel #
066-050-090
State Highways
Hwy 37
Railways
SF Bay RR- Mare Island
Schools
Mare Island Elementary
Waterways
Mare Island Strait, Carquinez Strait

Notice of Determination

Approving Agency
Department of Toxic Subsance Control
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Department of Toxic Substance Control Brownsfield and Environmental Restoration Program Berkeley Office 700 Heinz Avenue Bekeley, CA 94710

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No